Polyurethane waterproof coating

Home >  PRODUCT >  Waterproof Coating >  Polyurethane waterproof coating

All Categorys

Waterproof Coating
Waterproof Membrane
Polyurethane Polysulfide Sealant
Injection Grout
Grout Pump
Technical Equipment

All Small Categorys

Waterproof Coating
Waterproof Membrane
Polyurethane Polysulfide Sealant
Injection Grout
Grout Pump
Technical Equipment

Yuru One-component polyurethane waterproof coating

Quick Detail:

1. Different names of products:

One-component polyurethane waterproof coating /One-component polyurethane waterproof paint /polyurethane coating/951 polyurethane waterproof coating

2. Main uses:

It is suitable for waterproofing and anti-seepage of indoor and outdoor concrete buildings with stable structures and underground projects such as tunnels and subways.


  • Description
Inquiry

Is there a problem?
Please contact us to serve you!

Inquiry
Place of Origin:Nantong, Jiangsu, China
Brand Name:Yuru
Model Number:YR-P101-01
Certification:CE
Minimum Order Quantity:100 kilograms
Price:/
Packaging Details:20kg/barrel
Packaging specifications can be customized
Delivery Time:7-15days
Payment Terms:T/T, L/C,paypal, western union
Supply Ability:1000 tons per month


Description:

Water-curing one-component polyurethane waterproof coating is another type of one-component polyurethane waterproof coating developed on the basis of moisture-curing and latent-curing one-component polyurethane waterproof coating. It is a new generation of environmentally friendly waterproof coating.


Features:

The single-component packaging is ready for use right out of the barrel, which avoids quality instability caused by improper measurement of the proportions of two or more components during the construction process.

The single-component packaging is directly cured by adding water, which is non-toxic and pollution-free.

The waterproof coating film has the characteristics of high tensile strength, high elongation at break, good weather resistance, and strong ability to adapt to deformation.


Applications:

Roofing, underground waterproofing projects, indoor kitchen and bathroom waterproofing;

Waterproofing of parking lots, bridges and bridge decks;

Waterproofing and anti-seepage of subways, tunnels and underground projects.


Specifications:

No.ProjectIndex
Type IType II
1Surface drying time/h≤12
2Hard drying time/h≤24
3Tensile strength/MPa≥26
4Elongation at break/%≥500450
5Low temperature bendability-35℃,No cracks
6Water impermeability0.3MPa, 120min, impermeable


Competitive Advantage:

1. Long service life. After painting 3 times, the service life can reach more than 50 years.

2. The one-component polyurethane waterproof coating film has high tensile strength, good elongation, and excellent high and low temperature resistance, which is enough to withstand the shrinkage and expansion of the base layer due to temperature or stress.

3. Strong adhesion. It has very good adhesion with various base layers that meet the requirements and does not require base treatment agents. After the film is formed, it can withstand water immersion for a long time.

4. The one-component polyurethane waterproof coating film has good water resistance, corrosion resistance and bacteria resistance, is pollution-free and is environmentally friendly.

5. It is easy to apply. It can be applied thickly at one time and the coating film is dense, without pinholes or bubbles.

6. The color is generally adjustable, and it can also meet the humanized requirements of different customers for different colors on the surface.


01 Construction points:

Base layer requirements: The base layer must be smooth, free of sand, debris, uneven areas, and deformation joints and cracks in the base layer must be leveled with cement mortar. Pipe fittings, sanitary facilities, and floor drains connected to the base layer must be firm and the joints must be tight. The end should be smooth and no looseness is allowed.

Coating construction: Generally, three coats of coating are required. After the first coating is cured for 12-24 hours, the second coating is applied. The scraping direction is perpendicular to the direction of the first coating. If necessary, use Rigid protective layer, in order to increase the bonding force between the waterproof layer and the rigid protective layer, clean sand can be sparsely sprinkled on the surface of the coating film before it is completely cured. After the coating film with sand particles solidifies, , and then carry out rigid protective layer construction.

Detail processing: first apply a layer of paint on the Yin and Yang corners and the root of the pipe, then lay the reinforcement layer (fiberglass cloth or non-woven fabric, etc.), and make the paint completely penetrate the reinforcement layer.


02Matters need attention:

Once turned on, use it within half an hour. When the product is stored for a long time, a thin film may form on the surface of the paint, which can be removed during use without affecting the use effect.

It is strictly forbidden to walk on the waterproof layer before the coating is cured. It is strictly forbidden to damage the waterproof layer with heavy objects and sharp objects. The construction site must be ventilated, and construction workers should be equipped with safety helmets, gloves, work shoes and other protective supplies to avoid skin and eye irritation. No fire sources are allowed on site.

Restricted use: rain, snow, wind and sand, low temperature weather.

Storage and transportation:Store in a dry room, away from fire and heat sources. During storage, it should be placed upside down with the bucket mouth facing down. Avoid collision and exposure to sun and rain during transportation.

Reference dosage:For each millimeter of coating film thickness, the amount of paint used is approximately:2.2kg/㎡-2.5kg/㎡.

单组分





Online Inquiry

If you have any suggestions, please contact us!

Contact Us